Grassholme Reservoir Spillway Alteration Works

Grassholme Spillway Alterations

Design and Manufacture of a Bespoke Precast Solution for alteration works to Reservoir Spillways

 

 

Project Details

Grassholme Reservoir Spillway Alteration Works

The FLI Carlow Team have successfully completed a contract for the design and manufacture of a bespoke precast solution to raise the wall height on three 100 year old stone wall spillway structures at Grassholme Reservoir. FLI Carlow also undertook the design and manufacture of precast units to facilitate the reduction in height on an existing weir on the project.

This project involved many challenges including:

  • The development of a precast system capable of being retrofitted to an existing stone wall¬†¬†
  • The provision of an architectural pattern finish to match the existing wall
  • The manufacture of over 500 units for the project, working to a very tight production program

Manufacturing of the final units for the project was completed in late October 2020. Well done to the FLI Carlow Team on the successful completion of this challenging project.